Optimizing IONIS effectiveness |
This chart serves to estimate the total units
required, it does not contemplate various factors
that may require a small adjustment in the quantity
of units to be used in your project: Let’s
look at some of them:
1. In
projects with long pipes without interruption,
that is a straight shot without “T”’s
or Elbows, the maximum effective distance is increased
to 826 feet.
2. Conversely,
the presence of “T”s and “Elbows”
and areas of fluid turbulence, the above chart
is applicable. It is recommended that you apply
additional treatment points with IONIS
right after the pumps and heat transfer equipments.
IONIS will
provide technical support through electronic means
to ensure the appropriate application and installation
of the units. Feel free to contact us for support,
technical assistance and pricing for your project.
Please remember that IONIS
will not alter in any way your network, our
modular units are for external application
and at no time will interfere with your production
process.
|